Platform
Everything you need to
win more bids
From specification parsing to bid delivery — a complete preconstruction workflow, powered by AI.
Highland Medical Center
activeSummit Healthcare · 12 takeoffs · 78% complete
| Item | Location | Material | Hardware | Fire | Qty | Cost |
|---|---|---|---|---|---|---|
| D-101 | Main Lobby | Solid Core Oak | Schlage ND80 | 90 min | 2 | $2,480 |
| D-102 | Office Suite A | Hollow Metal | Von Duprin 99 | 60 min | 4 | $3,560 |
| D-103 | Conference Rm | Glass Aluminum | DERA-950 | — | 1 | $2,100 |
| D-104 | Storage B | Solid Core Birch | Schlage ND40 | 60 min | 2 | $1,960 |
| D-105 | Corridor 2F | Hollow Metal | Von Duprin 98 | 90 min | 3 | $2,670 |
| D-106 | Exam Room 1 | Solid Core Maple | Schlage ND80 | 60 min | 2 | $2,240 |
Bid Summary
Category cost distribution
Upload. We read everything.
Every CSI section, extracted automatically
Upload spec PDFs and Precaliq reads every section — identifying manufacturers, materials, finishes, fire ratings, hardware sets, and CSI codes automatically.
- Supports 200+ page specification documents
- Extracts data from all CSI divisions
CSI Divisions
08 14 00 — Wood Doors
Extracted from Project Specification, pages 142–148
Plans and schedules, classified by AI
Upload plans and Precaliq classifies sheets (door schedules, finish schedules, floor plans), extracts schedules, and combines plan data with specs.
- AI vision reads complex tables and ditto marks
- Multi-page schedule extraction
CSI Divisions
08 14 00 — Wood Doors
Extracted from Project Specification, pages 142–148
Generate. With precision.
Detailed takeoffs across every trade
Generate detailed takeoffs for doors, millwork, cabinets, flooring, storefront, ceiling systems, painting, waterproofing, roofing, MEP, structural steel, windows, and more.
- Each category has dedicated AI prompts tuned for construction accuracy
| Item | Location | Material | Hardware | Fire Rating | Qty |
|---|---|---|---|---|---|
| D-101 | Main Lobby | Solid Core Oak | Schlage ND80 | 90 min | 2 |
| D-102 | Office Suite A | Hollow Metal | Von Duprin 99 | 60 min | 4 |
| D-103 | Conference Rm | Glass Aluminum | DERA-950 | — | 1 |
| D-104 | Storage B | Solid Core Birch | Schlage ND40 | 60 min | 2 |
| D-105 | Corridor 2F | Hollow Metal | Von Duprin 98 | 90 min | 3 |
Standard, Premium, and Budget — instantly
Automatically generate Standard, Premium, and Budget options for any takeoff. AI swaps materials and manufacturers while preserving quantities and locations.
- Compare options side-by-side with instant cost deltas
| Item | Location | Material | Hardware | Fire Rating | Qty |
|---|---|---|---|---|---|
| D-101 | Main Lobby | Solid Core Oak | Schlage ND80 | 90 min | 2 |
| D-102 | Office Suite A | Hollow Metal | Von Duprin 99 | 60 min | 4 |
| D-103 | Conference Rm | Glass Aluminum | DERA-950 | — | 1 |
| D-104 | Storage B | Solid Core Birch | Schlage ND40 | 60 min | 2 |
| D-105 | Corridor 2F | Hollow Metal | Von Duprin 98 | 90 min | 3 |
Price. Together.
Collect quotes without the phone tag
Send takeoffs to vendors through a secure, tokenized link. Vendors download the Excel, add pricing, and upload back — no account required.
- AI parses vendor pricing and matches it to your takeoff items automatically
Vendor Quote Request
Highland Medical Center — Interior Doors
| Item | Description | Qty | Unit Price |
|---|---|---|---|
| D-101 | Solid Core Oak, 90min | 2 | $1,240 |
| D-102 | Hollow Metal, 60min | 4 | $890 |
| D-103 | Glass Aluminum Frame | 1 | $2,100 |
Assemble your bid, track every change
Create bid sessions, select variant options per category, and watch totals update in real-time. Every selection change is logged.
- Track user, timestamp, and cost impact for every bid modification
Bid Builder — Highland Medical Center
Bid Session V2 · Last edited 2 hrs ago
$45,200
$128,500
$67,800
$89,300
$34,600
$52,100
Bid Summary
Deliver. Professionally.
Professional proposals, one click
Generate professional PDF bid proposals and Excel workbooks with company branding, scope of work, cost breakdowns, terms, and signature lines.
- Bid versioning tracks V1, V2, V3 — send directly to clients from Precaliq
Versions
BID PROPOSAL
Highland Medical Center — V3
Spot revisions before they cost you
Upload revised specs or plans. Precaliq compares against originals, identifying additions, removals, and modifications with estimated cost impact.
- Integrates with bid builder to show how revisions affect your current bid
Revision Comparison
3 changes detectedSpec Rev A → Rev B · Highland Medical Center
New section requiring additional 6 doors at Corridor 3F
Est. impact: +$8,400
Fire rating changed: 60min → 90min for Level 2
Est. impact: +$3,200
Section removed, replaced by 09 65 19 Resilient Tile
Est. impact: -$1,800
Excel-native output
Every takeoff, variant comparison, and bid package exports to professionally formatted Excel workbooks — ready for submission or further analysis.
| Item | Description | Qty | Unit Cost | Total |
|---|---|---|---|---|
| D-101 | Solid Core Oak 3070 | 2 | $1,240 | $2,480 |
| D-102 | HM Door & Frame 3070 | 4 | $890 | $3,560 |
| D-103 | Alum Storefront Entry | 1 | $2,100 | $2,100 |
| D-104 | Solid Core Birch 3068 | 2 | $980 | $1,960 |